Our ProjectsOaks Fellowship Youth Center

Civil Design Services for this 49,000 sq. ft. addition included a utility relocation package, site grading, drainage, survey and landscape. The utility relocation was coordinated with Rocket Water (a regional water district) and was phased to reduce the impact on existing charter school operation. This included over 1,800 feet of new sanitary sewer lines and over 500 feet of new waterline. The Architect is Equip Studio. The project is under construction.