IMG_7621

Our ProjectsBaytown Fire Training Facility

The Master Plan was developed for the 22 acre Training Center that includes classrooms, fire station, high rise and residential burn buildings, fuel spill, trench rescue, confined space, tractor trailer, rail car, maritime and industrial fire props.

Baytown Fire Training Facility

The Master Plan was developed for the 22 acre Training Center that includes classrooms, fire station, high rise and residential burn buildings, fuel spill, trench rescue, confined space, tractor trailer, rail car, maritime and industrial fire props.  Phase 1 was a two story residential burn building, a confined space trainer, and associated infrastructure.  Phase 2 was an outdoor classroom building with restrooms, a 4 story rescue tower and a trench rescue prop.  Phase 3 is presently under design and will include a 6,000 square foot classroom building and a large scale oil service industry prop.

 

HGA is the prime consultant on this project.  Our design involvement includes site design, site grading, site drainage, site utilities, equipment supplier coordination, and construction phase services.  We are also the structural engineer of record on the project.  The architect for the project is Tovani Hart Architects in association with abercrombie planning + design.

view slideshow